The control tool for whoever follows the project in the field: actual progress, cost control, Earned Value and forecast at completion. It tells you whether you are on track for cost and time, and where a deviation originates, before it becomes a problem.
IN-Project is built for people who must answer three questions every week: how much have we really progressed, how much has it cost, where will we end up.
Project cost control and forecasting: CPI, SPI, EAC and trends over time, to decide in time whether to intervene, use reserves or revise the baseline.
Record actual progress and actuals straight from the field, by status date, with notes and reasons. The numbers are born where the work happens.
Approves progress, accepts anomalies with a reason, and governs baselines, change requests and reserve drawdowns.
The whole control cycle of a project, in an app that works on your data, locally.
Record progress and actuals by status date, with notes and supervisor approval workflow.
Cost control against the baseline, with thresholds and warnings; management reserves with approval of drawdowns.
BAC, PV, EV, AC, CPI, SPI, CV, SV, EAC, VAC, TCPI: as of today, over time by status date and by WBS node.
Estimates at completion for cost and time using the method from Chapter 3 of Impresa Numerica.
Frozen, versioned and archivable baselines; changes go through approved change requests.
Management of buffers and of contingency and management reserves, with traceability of every drawdown.
Create the WBS, tasks and dates in the app, or inherit the plan from MS Project or Excel. Export the data to update the original plan.
View the plan as a Gantt chart or manage daily work on a Kanban board.
Automatic anomaly checks, reasoned acceptance and reports exportable to Excel/CSV.
A simple workflow, designed for site and technical-office work.
Build the WBS and tasks in the app, or import the plan from MS Project or Excel. Then set the baseline.
At each status date enter progress and actuals; the supervisor approves.
Read CPI, SPI, EAC and trends to find where a deviation originates.
Generate reports and Excel/CSV. If you use MS Project, carry the data back into the plan.
A ready-filled project to explore the software without starting from scratch.
A complete demo project: download the file, install IN-Project and open it with File → Open. Everything you need to see the program at work is already there.
| Mario Rossi (Project engineer, plan coordinator) | mrossi / demo1 |
| Luca Verdi (Supervisor) | lverdi / demo2 |
| Administrator | admin / admin |
Version 2 takes IN-Project from the single user to the project team: several people on the same project and new site tools.
Several workstations on the same project, even on a network folder: local copy and synchronisation with conflict reconciliation, git-style.
Agile methodology inside the project, and Kanban-only or Agile-only projects alongside the Gantt.
Gantt, Agile/Kanban and multi-user in the same project, with well-defined scopes.
Daily site reports and an overall management report, generated from project data.
Management of completion lists and end-of-works open items.
Version history with restore, and automatic project backup.
Planned features, not yet released: content and timing may change. Version 1.0 is available today.
Version 1.0.1, the latest available. Free, no registration required.
The installer is not yet digitally signed: Windows may show a SmartScreen warning. Choose “More info” and then “Run anyway”. The software is released under the MIT licence. Questions or bug reports? Write to me.
The formulas and EVM method implemented by the calculation engine come from Chapter 3 of the manual: every indicator in the app points to its definition, formula and reference in the book.